top of page

Napa Logistics Building 4

leed Logo.png
American Canyon, CA

This 702,541 SF project consists of a concrete tilt-up shell building with tenant improvements and redesign of the east side of the building to accommodate construction of a rail spur. The building includes 8” unreinforced SOG with dowel baskets at all control joints, concrete tilt-up panels with a 40’ clear height to bottom of truss, loading docks, ESFR fire system, panelized roof system with rigid insulation, as well as, TPO roofing and decorative entries. Tenant improvement includes a full height insulated demising wall, 3,000 SF of office buildout, added dock levelers and rail doors, cooling system to maintain temperature between 60-62 degrees, and design-build MEP and fire sprinklers. The site is approximately 37.2 acres and includes grading and paving, along with underground utilities and ties in to existing utilities, bioswales, landscaping and the added rail spur.

Services Provided:

Architect of Record:

Client:

News:

Design, Construction

Ware Malcomb Architects

DWF IV NLP II, LLC

None

Completed 2021

Industrial Center

Design-Build

bottom of page