top of page
![](https://static.wixstatic.com/media/ebb702_ccb73618a9544ee7895ffd131986cba1f000.jpg/v1/fill/w_768,h_576,al_c,lg_1,q_85,enc_avif,quality_auto/ebb702_ccb73618a9544ee7895ffd131986cba1f000.jpg)
Harker Middle School
![leed Logo.png](https://static.wixstatic.com/media/ebb702_33a0d38dca834423b8b2a36e1bd38e40~mv2.png/v1/fill/w_144,h_141,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/leed%20Logo.png)
San Jose, CA
Project featuring removal of five existing “pod” buildings with replacement of a new 40,000 SF, 2-story academic building; the project also includes a remodel of the existing 9,000 SF gymnasium. Scope of work consists of a new football field with landscaping, and a new signalized intersection. In addition, two existing buildings are remodeled with an activity area, dance room, art and music studios, while the newly remodeled gym features locker rooms.
Services Provided:
Architect of Record:
Client:
News:
Design, Construction
Devcon Construction, Inc.
The Harker School
None
Completed 2021
Education
Design-Build
LEED Certified
![](https://static.wixstatic.com/media/ebb702_837f9835e5ba41479123a7e770b3be98~mv2.jpg/v1/fill/w_980,h_652,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/ebb702_837f9835e5ba41479123a7e770b3be98~mv2.jpg)
bottom of page