top of page

Coleman Highline

leed Logo.png
San Jose, CA

This project consists of design/build core and shell office development utilizing steel systems and a unitized curtain wall system. Project consists of one 5-story office building approximately 166,000 SF and one 6-story office building approximately 198,000 SF. The buildings are connected at the third floor by a pedestrian bridge called the “Highline” walkway.

Services Provided:

Architect of Record:

Client:

News:

Design, Construction

Devcon Construction, Inc.

Hunter Properties, Inc.

None

Completed 2021

Corporate

Design-Build

bottom of page