top of page

Castro Station

leed Logo.png
Mountain View, CA

This 49,000 SF 3-story office building consists of steel structure above a 103,000 SF, three level below grade poured-in-place concrete parking structure. Shoring is a beam and lagging with tie back system, and excavation includes contaminated soil and contaminated ground water. The building is a warm shell and includes sitework and infrastructure improvements. Project features glass and aluminum window assemblies, curtain wall assemblies, corrugated metal panels, plaster over metal stud, and a standing seam metal roof.

Services Provided:

Architect of Record:

Client:

News:

Construction

Chang Architecture, Inc.

SFF Castro Station, LLC

None

Completed 2014

Corporate

LEED Gold

bottom of page