![](https://static.wixstatic.com/media/ebb702_ccb73618a9544ee7895ffd131986cba1f000.jpg/v1/fill/w_768,h_576,al_c,lg_1,q_85,enc_avif,quality_auto/ebb702_ccb73618a9544ee7895ffd131986cba1f000.jpg)
625-685 Clyde
![leed Logo.png](https://static.wixstatic.com/media/ebb702_33a0d38dca834423b8b2a36e1bd38e40~mv2.png/v1/fill/w_144,h_141,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/leed%20Logo.png)
Mountain View, CA
This project features the demolition of a 4-building campus with new construction of 385,000 SF Class A office space. The new space consists of two 6-story post-tension concrete structures with glass curtain wall and GFRC skin. The buildings also feature round concrete columns and upturned beams/caps hidden under a raised access floor system to create a fully flat underside of deck. The project includes offsite improvements, as well as 8.85 acres of site work; it also consists of a new 5-level and a new 6-level parking structure totaling 320,000 SF, featuring precast skin, glass elevator enclosures, and PV panels at the roof.
Services Provided:
Architect of Record:
Client:
News:
Design, Construction
STUDIOS Architecture; Devcon Construction, Inc.
TMG Partners
None
Completed 2014
Corporate
LEED Platinum
![](https://static.wixstatic.com/media/ebb702_4b95c2ba1f2a4753ae14227294b3ff26~mv2.jpg/v1/fill/w_980,h_718,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/ebb702_4b95c2ba1f2a4753ae14227294b3ff26~mv2.jpg)