loading

Projects

University Expansion Tenant Improvement

Location: Redwood City
Features: Building 1 consists of 109,560 SF tenant improvement over three floors featuring high-end office space, kitchenettes, huddle spaces, conference rooms and computer labs. The first level includes audio rooms with strict acoustical requirements, a conservation vault, and a laboratory space including a fume hood and two snorkels. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution.

Building 2 consists of 162,769 SF tenant improvement over five floors featuring high-end office space, kitchenettes, huddle spaces, conference rooms, computer labs and an auditorium to seat approximately 80 guests. Project features the addition of intermediate stair and opening between the 3rd and 4th floors of the building. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution.

Building 3 consists of 169,098 SF tenant improvement over five floors featuring high-end office space, kitchenettes, huddle spaces, conference rooms, computer labs, and a recording studio. Project features extensive custom millwork, curved walls, and structurally freestanding partial height rooms. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution.

Building 4 consists of 129,059 SF tenant improvement project over six floors featuring high-end office space, kitchenettes, huddle spaces, conference rooms and computer labs. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution. Mandatory high-rise requirements as set forth by Redwood City, dictates both design and construction of the space and required strict pressurization control of egress paths.
Owner: Palo Alto Institution
Architect: Clive Wilkinson