loading

By Region

Hamilton Landing Hangar 7 & 9

Location: Novato
Features: Shell and core remodel project of two 60,000 SF airplane hangars with a 6-story control tower. Project consisted of a free-standing mezzanine that served as the second floor, and featured a structural retrofit of the larger window openings at the short ends of the building, footings, as well as roof upgrades.
Owner: Barker Pacific Group
Architect: Interior Architects